    The scene reproduces the Vardar River crossing, DN 700. The terrain and strata come from the interpretative lithological profile, the section face is the drawing at true size, and the bore follows the designed profile. Existing utilities, land parcels, the water level and the equipment are schematic; the rig is an American Augers DD600, modelled from catalogue data.

    The 3D scene requires WebGL 2. The full text of the process is available below.

    Hydrocarbon transmission engineering

    From ground to pipeline

    Investigation, design and horizontal directional drilling for natural gas and crude oil transmission pipelines

    We survey the route, check the legal and zoning status of the land and the clearances to existing utilities, investigate the site by geophysical and geotechnical methods, design the pipeline and its horizontal directional drilling crossings, and provide technical assistance during construction. We work in Romania, Bulgaria and North Macedonia.

    01

    Topographic survey

    We survey the pipeline corridor and the entry and exit areas of the bore with GNSS receivers and a total station, in the national projection system (Stereo 70 in Romania). The measured points give the site plan and the digital terrain model, on which the longitudinal profile of the bore is laid out.

    • site plan
    • coordinate schedule
    • digital terrain model
    02

    Land status along the route

    For every property affected by the corridor we check the land register and the cadastral plan, the zoning regime, protected natural areas and flood zones. We draw the constraints on the site plan before the route is fixed, so that the rig pad, the mud pits and the string assembly lane sit on land for which access and construction rights can be obtained.

    • legal status of the properties
    • constraints on the plan
    • permits and approvals required
    03

    Coexistence with existing infrastructure

    Pipelines, cables, overhead power lines, roads, railways and canals in the vicinity are drawn on the plan with their protection and safety zones. Clearances and crossing angles are checked against the codes in force for each utility. For the bore, the distance to neighbouring steel pipelines also matters, since they disturb the magnetic steering of the bit. Where proximity cannot be avoided, we design the protection of the existing utility; at Balș we designed the protection of the DN150 and DN600 gas pipelines at a 110 kV underground power cable.

    • networks on the plan
    • clearances checked against the codes
    • protection details
    04

    Geophysical survey

    The crossing section is investigated by geophysical methods suited to the stratification intercepted by the geotechnical boreholes. High-resolution seismic reflection gives the geometry of the strata beneath the riverbed, seismic refraction gives the P-wave velocities, MASW and MAM give the shear-wave velocity (Vs) profile, and electrical resistivity tomography delineates the strata by resistivity contrast and reveals the saturated zones.

    Methods applied at the Vardar River, at the Poarta Albă – Midia Năvodari canal and at Kozloduy, where the MASW and MAM lines had a minimum target depth of 225 m.

    • seismic sections
    • resistivity tomograms
    • Vs profiles
    05

    Geotechnical boreholes

    Geotechnical boreholes and dynamic probing give the stratification, the grain-size distribution, the SPT N-values and the design geotechnical parameters of each stratum. We correlate the layer boundaries interpreted on the geophysical sections with the lithology logged in the boreholes and calibrate the geophysical interpretation on them, so that every unit of the lithological profile has samples and tests from a borehole.

    Boreholes and probing carried out on Lot 3 of the Vertical Corridor, Rupcha – Vetrino, and at the Vardar River.

    • borehole logs
    • design geotechnical parameters
    • geotechnical report
    06

    Lithological profile and hydrology

    The geophysical data and the boreholes are interpreted together in the lithological profile, with the units followed along the whole length of the crossing. We select the host stratum from the profile on the basis of hole-wall stability and formation permeability, which governs the risk of drilling-fluid losses. The hydrological study gives the design discharge and the scour depth, and the pipeline cover is measured from the design scour level.

    • interpretative lithological profile
    • design scour level
    • host stratum
    07

    Pipeline and HDD design

    On the lithological profile we lay out the bore, with entry and exit points and angles, bend radii and the horizontal section in the selected stratum. We check pullback force, installation stresses in the pipeline, buoyancy and ballasting of the string, and the annular pressure of the drilling fluid against the fracture pressure of the ground. Outside the crossing the pipeline is laid in trench, to ANRE Order 118/2013 for natural gas and to the CONPET standards for crude oil. The design starts from the site plan and comprises the longitudinal profile, construction details, technical reports and calculation notes.

    • route and longitudinal profile
    • design checks
    • construction details
    08

    The rig

    The bore is designed for the class of rig that will drill it. The rig in the scene is an American Augers DD600, modelled from the manufacturer's catalogue: 272 t thrust and pullback force, 135,581 Nm rotary torque and an entry angle adjustable between 8.5 and 18°. The computed pullback force, the drilling-fluid flow rate and pressure are checked against these limits.

    • pullback force against rig capacity
    • entry and exit angles
    • mud pump flow rate and pressure
    09

    Pilot hole

    The pilot bore leaves the entry point and follows the designed profile to the exit point. The drill string, with a jet bit or a mud motor, is pushed and rotated by the rig, and the bit position is surveyed at every joint, by a wireline steering system with a surface coil or, next to steel pipelines, by gyroscopic steering. At the Vardar River the drilled length is 554.27 m, with 900 m radii, a 10° entry, an 8° exit and the horizontal section at elevation 31.00, in unit L3.

    • bit and mud motor
    • steering and survey of the drilled path
    10

    Reaming

    The pilot hole is reamed in one or more passes to the final diameter, with the reamer pulled from the exit towards the rig. The bentonite-based drilling fluid supports the hole wall and carries the cuttings to the mud pit; after the recycling unit the cleaned fluid returns to the circuit. The annular pressure is kept below the fracture pressure of the ground, so that the fluid does not break out at the surface or into the riverbed. For the Ø711 mm pipeline, the verification report took a final hole of Ø1067 mm.

    • successive reaming passes
    • closed-loop drilling-fluid system
    • annular pressure below the fracture pressure
    11

    Pullback

    The string is welded on the exit side and laid on rollers. At pullback, the pulling head and the swivel connect the string to the reamer, and the rig pulls the string through the fluid-filled hole to the entry point. At both ends the string is tied in to the trenched pipeline. From string preparation to pullback we provide the contractor with technical assistance and construction consultancy. The five crossings on the Kulata – Kresna looping were built as designed.

    ANRE licence ET 24543 covers the construction of natural gas transmission systems.

    • pilot hole
    • reaming
    • pullback
    • technical assistance
    12

    Pipeline in service

    The Ø711 × 14.2 mm L450 pipeline remains in the selected stratum beneath the riverbed, with the cover checked stake by stake against the ground surface and the stratum boundaries. On both sides of the crossing the route continues in trench.

    • as-built profile
    • documents for acceptance
    13

    The interpretative lithological profile

    The section face in the scene reproduces the project drawing, the interpretative lithological profile of the Vardar River crossing, at the same horizontal and vertical scale, with the designed bore drawn over the lithological units. The full drawing can be read in the next section.

    • interpretative lithological profile
    • designed bore on the profile
    ANRE licensedPT 24542 and ET 24543, design and construction of natural gas transmission systems; PPI 24541; valid until 06.08.2030
    ISO 9001 · ISO 14001 · ISO 45001Quality, environment, occupational health and safety, certified to 2029
    DCA EuropeAssociate member of the Drilling Contractors Association since 2023
    Trenchless Young Professional AwardTrenchless Balkans 2022, awarded to the company's managing director, Eng. Dragoș Atanasiu
    § 01
    The drawings

    Lithological profiles and designed bores

    Three horizontal directional drilling crossings, each with the designed bore drawn on the interpretative lithological profile. The drawings are read horizontally, from one end to the other, as the page scrolls.

    Vardar River, DN 700 gas, North Macedonia

    The interpretative lithological profile of the crossing, compiled from seismic and geoelectrical surveys, dynamic probing and six geotechnical boreholes, at the same horizontal and vertical scale. We drew the bore from the final verification report over the profile.

    Interpretative lithological profile of the Vardar River crossing, with boreholes BH1–BH6 and the three lithological units, overlaid with the designed bore profile
    Position in the drawing

    Lithological units

    L1 · Sand with gravel

    Gravel with sand, with sand and silty sand within the first 3 m, locally sand with gravel, yellow brown, generally loose, locally medium dense at the base. The formation is unstable, with high risk for drill hole collapse. The formation has high permeability, with high risk for drilling fluid losses.

    Density 1.90 g/cm³ · NSPT 8–11

    L2 · Gravel with sand

    Gravel with sand, with rare boulders, locally with silty-clayey binder, brown, dense. The formation is mostly stable, with low to medium risks for drill hole collapse. The formation has moderate permeability, with medium risks for drilling fluid losses.

    Density 2.05 g/cm³ · NSPT 47–59

    L3 · Sand with gravel, with silty-clayey binder

    Medium to coarse sand with fine gravel, with silty-clayey binder, grey. The formation is very dense, with strong binder between clasts. The formation is stable, with very low risks for drill hole collapse. The formation has low permeability, with low risks for drilling fluid losses.

    Density 2.20 g/cm³ · NSPT = R (refusal)

    Designed profile

    Pipe
    Ø711 × 14.2 mm, L450
    Length
    554.27 m drilled; 552.03 m in plan
    Entry
    ch 103.63, el. 49.64, at 10°
    Exit
    ch 655.66, el. 48.33, at 8°
    Radii
    900 m
    Horizontal section
    el. 31.00, in unit L3
    Final hole
    Ø1067 mm
    Document
    VRD-HDD-DES-001 Rev. 0

    The Danube at Cernavodă, Ø20 in and Ø28 in crude oil, CONPET S.A.

    Three parallel bores of 1,466.0 m each, for the Ø20 in and Ø28 in crude oil pipelines and for the Ø219.1 mm process line, which carries the drilling fluid between exit and entry and is used as a magnetic reference for steering the drill string. The design placed the rig on the right bank, at Cernavodă, and the string assembly on the left bank, at Stelnica. Because of the existing pipelines in the corridor, the pilot bore was designed with gyroscopic, non-magnetic steering. On the drawing, the red line represents the designed bore, about 20 m below the thalweg.

    Interpretative lithological profile of the Danube crossing at Cernavodă, with the designed bore
    Position in the drawing

    From the detailed design

    Pipelines
    Ø508 × 14.2 mm L360NE; Ø711 × 16 mm L360N
    Mud line
    Ø219.1 × 8.0 mm
    Length
    1,466.0 m drilled for each bore; 1,462.5–1,462.8 m in plan
    Radius
    1,500 m
    Below the riverbed
    top of pipe 19.6–19.8 m below the thalweg; pipe axis 20.0–30.8 m below the bed
    Design discharge
    Q1% = 7,870 m³/s
    Pilot steering
    gyro, non-magnetic
    Drawing
    no. 23A of the detailed design, 2022

    The Borcea branch at Fetești, Ø20 in and Ø28 in crude oil, CONPET S.A.

    On the same Constanța – Bărăganu route, the Borcea branch was crossed to the same scheme, with the two crude oil pipelines and the process line drilled in parallel, with 1,500 m radii. The design placed the rig on the left bank and the string assembly on the right bank. The six bores at the Danube and at the Borcea were drilled in three months.

    Interpretative lithological profile of the Borcea branch crossing at Fetești, with the designed bore
    Position in the drawing

    From the detailed design

    Pipelines
    Ø508 × 14.2 mm L360NE; Ø711 × 16 mm L360NE
    Mud line
    Ø219.1 × 8.0 mm
    Drilled length
    1,258.0 m (Ø20 in); 1,263.0 m (Ø28 in); 1,257.0 m (mud line)
    Radius
    1,500 m
    Below the riverbed
    top of pipe 19.6–19.8 m below the thalweg; pipe axis 20.0–34.3 m below the bed and 7.4–7.6 m below the crest of the right-bank levee
    Design discharge
    Q1% = 9,540 m³/s
    Pilot steering
    gyro, non-magnetic
    Drawing
    no. 22A of the detailed design, 2022

    The Danube and Borcea crossings in the press

    § 02
    HDD design

    What we check on the profile

    The bore profile is drawn on the interpreted geological section, with the host stratum selected from the investigation. Each check is based on a guideline or standard of European horizontal directional drilling practice, in the edition in force at the date of the design.

    Profile geometry

    Entry and exit angles, minimum bend radius, cover below the design scour level and an alignment kept within the selected stratum. At the Vardar River, the 900 m radius satisfies the condition R ≥ 1 200 · OD for the Ø711 mm pipeline.

    DCA Technical Guidelines, 5th ed. (2025)

    Pullback force

    Segmented model, computed element by element from the pulling head to the end of the string, with friction on the hole wall, the capstan effect in the bends and the viscous drag of the drilling fluid.

    ASTM F1962-22, adapted to steel · PRCI · ASCE MOP 108, 3rd ed. (2024)

    Installation stresses and strains

    Tensile stress, bending in the curves and external pressure, checked in combination, together with the collapse resistance of the wall.

    NEN 3650-2:2020+A1:2024 · API 5C3 / ISO 10400

    Buoyancy

    Apparent weight of the pipeline in the drilling fluid and the ballasting of the string, which reduces the net buoyancy and, through it, the friction on the hole wall, keeping the pullback force within the rig's capacity.

    ASCE MOP 108 · DCA Technical Guidelines

    Drilling-fluid pressure

    Maximum allowable ground pressure along the bore, compared with the annular pressure required for fluid circulation, so that the fluid neither fractures the ground nor reaches the surface or the riverbed.

    NEN 3651:2020 · Luger & Hergarden, Delft Geotechnics (1988)

    Line pipe

    Wall thickness, steel grade and design pressure, to the code of the country where the line is built.

    EN 1594:2024 · API 5L · SR EN ISO 3183 · ANRE Order 118/2013 · CONPET standards
    § 03
    The rig in the model

    American Augers DD600

    The rig in the scene is rebuilt to its catalogue dimensions. The values below come from the manufacturer's brochure and represent the limits against which the calculation of a bore designed for a rig of this class is checked.

    Source: American Augers, DD600 brochure (2023). American Augers and DD600 are trademarks of their respective owners. The 3D model is a simplified reconstruction, with no commercial link to the manufacturer.

    ParameterCatalogue value
    Thrust and pullback600,000 lb (272 t)
    Carriage4 pinions, up to 37 m/min (120 ft/min), 3 speed ranges
    Rotary135,581 Nm (100,000 ft·lb), up to 130 rpm
    EngineCat C18, 578 kW (755 hp)
    Drilling fluid3,122 L/min (825 gpm) at 103 bar (1,500 psi); 88.9 mm fluid course
    Wrenchesclamp range Ø89–286 mm; breakout 329,465 Nm; makeup 246,760 Nm
    Drill pipeRange II
    Entry angle8.5–18°
    Cabseparate, 3.66 m or 6.10 m (12 ft or 20 ft)
    Dimensions16 × 2.54 × 3.51 m; 43 t (95,000 lb) with wrenches and fluids
    § 04
    Investigation

    The data the profile rests on

    The geophysical methods cover the route continuously between boreholes, and the geotechnical boreholes calibrate them. Their correlation gives the interpretative lithological profile on which the directional bore is designed.

    MethodResultWhere we applied it
    High-resolution 2D seismic reflectiongeometry of the layers and contacts beneath the river bedVardar River; Poarta Albă – Midia Năvodari canal
    Seismic refractionP-wave velocities and depth to the stiff layersVardar River
    MASW and MAMshear-wave velocity (Vs) profile with depthVardar River; Kozloduy, to a 225 m target depth
    Downhole seismicwave velocities measured in the borehole, with a 500 kg gravity sourceKozloduy, Units 7 and 8
    Geoelectrical surveys (resistivity tomography and vertical electrical sounding)lithological contrasts and saturated zonesVardar River; Vertical Corridor, Rupcha – Vetrino
    Geotechnical boreholes, dynamic probingstratification, grain size and design geotechnical parametersRupcha – Vetrino; Vardar River
    Hydrological studydesign discharges and scour depthPoarta Albă – Midia Năvodari canal
    Thermal resistivityheat dissipation around a cable installed by HDDCopșa Mică solar plant connection
    § 05
    Portfolio

    Portfolio of horizontal directional drilling works

    A selection of works documented by contract or by the design documents, in reverse order of the contract year. The last column states the company's contribution to each project.

    No.Obstacle crossedPipeline or lineCountryYearCompany contribution
    1DN150 Iancu Jianu – Balș gas pipeline110 kV underground power cableRO2026design
    2Vardar Rivergas, DN700 Gevgelija – Negotino, Ø711 × 14.2 mmMK2026HDD design and verification report; geophysical and geotechnical study
    3Olt River, at Ostrovenigas, branch line to DN400 Govora – DrăgășaniRO2026geotechnical and geophysical studies; design; supervision
    4Poarta Albă – Midia Năvodari canalcrude oil, 14 and 28 in Constanța – BărăganuRO2025hydrological and geotechnical studies; geophysics including seismic reflection
    5Golyama Kamchiya River, km 22+909gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
    6Glavnitsa River, km 37+149gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
    7Provadiyska River, km 51+453gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
    8Route of the Copșa Mică solar plant cable connectionunderground power cableRO2025geotechnical, geological and geophysical study; interpretative lithological profile for HDD
    9Struma River, km 1+500gas, DN700 Kulata – Kresna, Ø711 × 14.2 mmBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
    10Struma River, km 4+500gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
    11Struma River, km 7+300gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
    12Strumeshnitsa River, km 13+100gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
    13Struma River, km 45+500gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
    14Salina Turda, network of 12 drainsdrains for infiltration waterRO2022geotechnical and geophysical study; design
    15Danube River, at Cernavodă (C1–C2)crude oil, Ø20 in and Ø28 in Constanța – BărăganuRO2021geotechnical and geophysical studies; design; permitting; construction support
    16Borcea branch, at Fetești (C3–C4)crude oil, Ø20 in and Ø28 in Constanța – BărăganuRO2021geotechnical and geophysical studies; design; permitting; construction support

    RO Romania · BG Bulgaria · MK North Macedonia. Items 5–7 and 9–13 belong to the Vertical Gas Corridor (Bulgartransgaz EAD), item 2 to the Greece – North Macedonia interconnector.

    § 06
    Projects

    Selected works

    For the larger infrastructure projects that include our work, we link to the press coverage and to the releases of the transmission operators and of the financing institutions.

    The articles describe these projects as a whole; the company's contribution is the one recorded on each project sheet.

    International

    Vertical Gas Corridor, Kulata – Kresna looping, Bulgaria

    Five horizontal directional drilling crossings of the Struma and Strumeshnitsa rivers, on the pipeline that increases the transmission capacity between Greece and Bulgaria. We carried out the geotechnical and geophysical studies, designed the bores and provided construction consultancy. The crossings were built as designed.

    Pipeline
    DN700; at km 1+500, Ø711 × 14.2 mm, L415ME
    Locations
    Struma km 1+500, 4+500, 7+300, 45+500; Strumeshnitsa km 13+100
    Year
    2025
    Client: GBS Energy Solutions EAD · End client: Bulgartransgaz EAD

    Vertical Gas Corridor, Lot 3, Rupcha – Vetrino, Bulgaria

    Three river crossings on the pipeline that doubles Bulgaria's exit capacity towards Romania at the Negru Vodă / Kardam point. The work started with the geotechnical boreholes, continued with the geophysical and geotechnical study and covers the design of the directional bores and construction consultancy.

    Pipeline
    DN1200, Ø1219 × 17.5 mm, L450ME
    Locations
    Golyama Kamchiya km 22+909; Glavnitsa km 37+149; Provadiyska km 51+453
    Years
    2025–2026
    Client: GBS Energy Solutions EAD, EPC contractor · Owner: Bulgartransgaz EAD

    Vardar River crossing, Greece – North Macedonia interconnector

    Design of the directional bore on the Gevgelija – Negotino section and the final verification report issued before drilling, based on the geophysical and geotechnical study of the route. The study comprised high-resolution 2D seismic reflection, seismic refraction and MASW, geoelectrical surveys, dynamic probing, geotechnical boreholes and the interpretative lithological profile.

    Pipeline
    DN700, Ø711 × 14.2 mm, L450
    Geometry
    552.03 m in plan; 554.27 m drilled; R 900 m
    Document
    VRD-HDD-DES-001
    Year
    2026
    Client: GBS Energy Solutions EAD · Contractor: Rapid Bild DOO Kumanovo · Investor: NER Skopje

    Kozloduy Nuclear Power Plant, Units 7 and 8, Bulgaria

    Geological and geophysical study of the site of the two AP1000 units, comprising MASW and MAM seismic surveys on four lines to a minimum target depth of 225 m, seismic source generation for the downhole tests and integrated interpretation with the geotechnical boreholes.

    Methods
    MASW; MAM; downhole
    Source
    gravity drop, 500 kg (boreholes 3 and 4, 150–30 m)
    Year
    2025
    Client: Geotechnika ABS Ltd, Sofia

    Romania

    Danube at Cernavodă (C1–C2) and Borcea branch at Fetești (C3–C4), imported crude oil lines

    Replacement by horizontal directional drilling of the crossing lines of the Constanța – Bărăganu pipelines, in place of the 12¾ in lines from 1968–1978. We carried out the geotechnical and geophysical studies and the design, handled the permitting and provided technical assistance; the six bores were drilled in three months. The work was presented together with Horizontal Drilling International at the DCA Europe annual congress.

    Pipelines
    crude oil, Ø20 in and Ø28 in
    Bores
    6, drilled in three months
    Years
    2021–2023
    Owner: CONPET S.A. · Contractor: CIS GAZ S.A. – Horizontal Drilling International

    Salina Turda, drainage of infiltration water

    Geotechnical and geophysical study and design of a network of 12 drains installed by horizontal directional drilling, for the long-term drainage of the western overburden hill.

    Drains
    12, by directional drilling
    Year
    2022
    Owner: Salina Turda S.A.

    Poarta Albă – Midia Năvodari canal, 14 and 28 in crude oil lines

    Hydrological and geotechnical studies and geophysical surveys, with seismic reflection, for the replacement by horizontal directional drilling of the Constanța – Bărăganu pipelines at the canal crossing.

    Pipelines
    crude oil, 14 and 28 in
    Stage
    approvals, March 2026
    Years
    2025–2026
    Owner: CONPET S.A.

    In 2026 we are also designing the diversion of the Ø20 in Bărăganu – Onești crude oil line at the Focșani – Brăila expressway and the replacement of about 3 km of the Ø10¾ in crude oil line at Independența, both for CONPET S.A., and the protection of the DN150 and DN600 gas pipelines at the 110 kV underground cable in Balș.

    § 07
    On site

    Our work in the field

    Photographs from the sites where we provided technical assistance or construction consultancy, from string preparation to pullback through the drilled hole.

    Pipe string ready for pullback, drone view
    Pipe string ready for pullback, drone view
    Night-time pullback
    Pullback runs through the night
    Pullback work front, drone view
    Pullback work front
    Two coated pipes in the trench before tie-in
    Pipes in the trench before tie-in
    Valve assembly on a transmission pipeline
    Existing valve assembly
    Valve station and pipe string, drone view
    Valve station and pipe string, drone view
    § 08
    Services

    Due diligence, operating pipelines and water

    Besides the design of horizontal directional drilling crossings, we serve investors who buy or develop land, projects in the permitting stage and works located near transmission pipelines or watercourses. Each service can be contracted separately, for a single site or for a portfolio of sites.

    Due diligence for land and projects

    Preliminary screening of candidate sites

    When an investor is considering several sites, we run a quick check of each site against the land book extract and public sources. The screening helps the investor choose the sites for which full due diligence is justified.

    What we check
    • plot boundary, rebuilt from the land book extract and georeferenced
    • zoning regime under the documentation in force
    • nearby gas and crude oil transmission pipelines and power lines
    • protected natural areas, flood zones and aeronautical easements
    • road access
    You receive
    • a favourability note for each site, by criteria

    Site due diligence, technical and legal

    For the selected site we establish what can be built, which restrictions encumber it and what must be obtained before permitting. Each restriction is recorded with the measured distance, the affected area and the regulation that imposes it.

    Technical
    • existing networks and installations on and around the site
    • protection and safety zones of gas and crude oil transmission pipelines and power networks
    • technical constraints of the site, arising from roads, railways, water, protected areas and airspace
    Legal
    • cadastral and land book documentation, with encumbrances and the owner's position
    • zoning regime, need for a zonal plan (PUZ) and validity of the zoning documentation
    • inventory of required approvals and consents
    • legal opinion, issued by our partner attorney, where the order requires it
    You receive
    • due diligence report, drawings and GIS data (KMZ, GeoJSON), in Romanian and, on request, in English
    • on lenders' request, a reliance letter

    Documentary due diligence of projects in permitting

    When a project already holds an urban planning certificate, approvals, a grid connection permit or a building permit, we check whether the documents cover the current situation of the land. The service is intended for investors, advisers and lenders taking over a project.

    How we work
    • inventory of the documents received and list of missing documents
    • up-to-date land book extracts for every plot occupied or crossed, checked against the urban planning certificate, the site plan and the ANCPI geoportal; we flag plots renumbered after systematic registration and plots crossed but missing from the certificate
    • plot register, with the deed that grants access and construction rights for each item and the items not covered
    • answers to advisers' and lenders' questions and to the risk matrix, with the action needed for each risk
    • on request, technical review of the design, cost–benefit analysis, construction risk and project vulnerabilities
    You receive
    • plot register in Excel, Q&A note and due diligence report

    Zonal plan, utilities and permit tracking

    After the land purchase, we assist the investor until the building permit is issued.

    Zonal plan (PUZ) advisory
    • design brief for the PUZ
    • review of the documents prepared by the investor's designers for the PUZ approvals
    • meetings with the designer and the authorities
    • review of the final documentation before it is filed for approval
    Preliminary utility studies
    • possible connection points for power, gas, water and sewerage, and stormwater discharge
    • land improvement works (ANIF) on the site and their constraints
    • preliminary solutions note, ahead of the operators' connection procedure
    Permit tracking
    • validity of approvals and consents, authority deadlines and land book changes on the affected plots, with a change note at the agreed interval

    Operating transmission pipelines

    Diverting and making safe transmission pipelines

    A new road, a substation, a housing area or a warehouse may fall within the protection zone or the safety zone of a natural gas, crude oil, gasoline, condensate or ethane transmission pipeline. For the developer of that work we design the diversion of the pipeline or its protection in place, under the conditions set by the transmission system operator, and obtain the operator's approval of the design.

    How we work
    • we review the operator's location permit and the technical standards applicable to the pipeline
    • we locate the pipeline on site together with the operator's field staff, recording its route, depth and test posts, and the findings go into the cooperation note signed with the operator
    • we select the solution, whether diversion of the section, casing, concrete slabs or recoating, with the clearances to the new structures checked against the operator's standard
    • we prepare the technical design, specifications, construction details, quantities and cost documentation, and defend it before the operator's technical and economic committee
    What the design covers
    • the diverted route, with profile and bends of at least 5 D on piggable lines
    • cased crossings of roads and dikes, by open cut, pipe ramming, auger boring or HDD, with vent, spacers and end seals
    • cathodic protection of the casings, with galvanic anodes and test posts
    • tie-in programme, with emptying of the line or product transfer, mechanical stoppling, cold cutting and recommissioning
    • pressure test of the new section, decommissioning of the old line and return of the recovered pipe to the operator
    • gasoline pipeline diversion
    • gas pipeline diversion
    • lateral diversion
    • protection at new road
    • dike crossing
    • casing

    Construction and acceptance support

    The designer answers for the solution until acceptance. During construction we stay in contact with the contractor, the operator and the site supervisor.

    What we do
    • attend the critical inspection stages and the pressure test
    • issue site instructions where ground conditions differ from the design
    • check additional quantities against the bill of quantities
    • attend the acceptance and the handover of the diverted pipeline to the operator

    Water

    Hydraulic studies for watercourse crossings

    A pipeline crossing a river or a canal is laid below the depth to which floods can erode the bed. The hydraulic study establishes this scour depth and the bank protection required along the crossing reach.

    How we work
    • we obtain the 1 % and 0.1 % peak discharges from the river basin administration or from INHGA
    • we survey river cross-sections upstream and downstream of the crossing
    • we compute water levels along the reach, with the backwater of bridges and existing works
    • we compute general and local scour and check bank stability
    • we place the pipeline below the scour level, with a safety margin, and size the bank protection
    You receive
    • the hydraulic study, with calculations and drawings, used in the design and in the water management file

    Water management approval and authorisation

    For the works listed in art. 48(1) of the Romanian Water Law no. 107/1996, the location permit and the water management approval are prerequisites for the building permit, under art. 49(31) of the same law. For operation, the water management authorisation is obtained afterwards.

    What we do
    • technical documentation for the water management approval, with the hydraulic study and, where required, the flood risk study
    • filing with the river basin administration and answers to its requests, until the approval is issued
    • documentation for the water management authorisation, after construction
    • clarifying which hydrological data apply when the work holds an older approval

    Site investigation and permits

    Site investigation

    Site investigations are scoped on the basis of the due diligence results, at the points that matter for the project.

    • geotechnical studies
    • geophysical surveys
    • hydrological studies
    • topographic surveys
    • UXO detection

    Approvals, consents and land

    A linear project requires approvals from network operators, road and water administrators, environmental authorities and local authorities. We handle them as one file.

    What we do
    • register of existing networks in the corridor, from operator plans and the topographic survey
    • each approval condition linked to the design document that meets it
    • inventory of affected plots, with temporary and permanent land take
    • removal of land from agricultural use
    § 09
    About

    Atanasiu & Skills

    Atanasiu & Skills S.R.L., formerly Atanasiu Proiect S.R.L., has worked from Târgoviște since 2019. Design, survey, geophysics and geotechnics work in one team, so the bore profile is drawn on data acquired and interpreted by the people who design it.

    The company is led by Eng. Dragoș Alexandru Atanasiu, an engineer in Mining, Petroleum and Gas, specialised in Hydrocarbon Transmission, Storage and Distribution (Lucian Blaga University of Sibiu, top of the graduating class), and an ANRE-licensed PGT designer for natural gas transmission systems. Eng. Atanasiu designed the crossings on the Kulata – Kresna looping and the Vardar River crossing, led Lot 3 of the Vertical Corridor as chief project engineer and was project manager of the geological and geophysical study for Kozloduy Units 7 and 8.

    CONPET S.A. rated the company "very good" for design and field studies in recommendation no. 34670 of 02.11.2020. We have been an associate member of DCA Europe since 2023, at the invitation of the association's vice-president.

    DCA Europe associate member
    ISO 9001 ISO 14001 ISO 45001
    § 10
    Contact

    Write to us about your project

    E-mail
    office@atanasiuskills.com
    Office
    Calea Domnească 57, building C1
    Târgoviște 130167, Dâmbovița, Romania