Hydrocarbon transmission engineering

Horizontal directional drilling crossings, designed on the geological profile of the route

We investigate the ground with geophysics calibrated on geotechnical boreholes, build the lithological profile along the route and design the bore on it: geometry, pullback force, pipe stresses, buoyancy and drilling-fluid pressure. We work on natural gas and crude oil transmission pipelines in Romania, Bulgaria and North Macedonia.

Project register Request a proposal
3countries: Romania, Bulgaria, North Macedonia
5crossings on the Kulata – Kresna looping, built as designed
DN1200largest diameter designed, Ø1219 × 17.5 mm
225 mtarget depth of the seismic survey at Kozloduy
ANRE licensedPT 24542 · PPI 24541 · ET 24543, natural gas transmission systems, valid until 06.08.2030
ISO 9001 · ISO 14001 · ISO 45001Quality, environment, occupational health and safety, certified to 2029
DCA EuropeAssociate member of the Drilling Contractors Association since 2023
Trenchless Young Professional AwardTrenchless Balkans 2022, awarded to the company's managing director, Eng. Dragoș Atanasiu
HDD design

How a crossing is designed

The bore profile is drawn on the interpreted geological section, with the host stratum chosen from the investigation. Each check rests on a guideline or standard of European HDD practice, in the edition in force at the date of the design.

Schematic of a horizontal directional drilling crossing design scour level river drilling rig pipe string L, drilled length α β R h U1 U2 · host stratum U3

Schematic, vertical scale exaggerated. α and β are the entry and exit angles, R the bend radius, h the cover to the pipe measured from the design scour level and L the drilled length. U1, U2 and U3 are the lithological units of the interpretive profile; the bore stays in U2.

Profile geometry

Entry and exit angles, minimum bend radius, cover below the design scour level and an alignment kept in the chosen stratum. At the Vardar River the 900 m radius meets R ≥ 1 200 · OD for the Ø711 mm pipe.

DCA Technical Guidelines, 5th ed. (2025)

Pullback force

Segmented model, computed element by element from the pulling head to the tail of the string, with wall friction, the capstan effect in the bends and fluid drag.

ASTM F1962-22, adapted to steel · PRCI · ASCE MOP 108, 3rd ed. (2024)

Installation stresses and strains

Tension, bending in the curves and external pressure, checked in combination, and the collapse resistance of the wall.

NEN 3650-2:2020+A1:2024 · API 5C3 / ISO 10400

Buoyancy

Apparent weight of the pipe in the drilling fluid and the ballast that keeps pullback force and friction within the rig's capacity.

ASCE MOP 108 · DCA Technical Guidelines

Drilling-fluid pressure

Allowable ground pressure along the bore compared with the pressure needed for circulation, so that the fluid neither fractures the ground nor breaks out at the surface or into the river.

NEN 3651:2020 · Luger & Hergarden, Delft Geotechnics (1988)

Line pipe

Wall thickness, steel grade and design pressure, to the code of the country where the line is built.

EN 1594:2024 · API 5L · SR EN ISO 3183 · ANRE Order 118/2013 · CONPET standards
Investigation

The data the profile rests on

Geophysics covers the route continuously between boreholes, and the boreholes calibrate it. Together they give the interpretive lithological profile on which the bore is designed.

MethodWhat it givesWhere we used it
High-resolution 2D seismic reflectiongeometry of the layers and contacts beneath the river bedVardar River; Poarta Albă – Midia Năvodari canal
Seismic refractionP-wave velocities and depth to stiff layersVardar River
MASW and MAMshear-wave velocity (Vs) profile with depthVardar River; Kozloduy, to a 225 m target depth
Downhole seismicwave velocities measured in the borehole, with a 500 kg gravity sourceKozloduy, Units 7 and 8
Geoelectrical survey: resistivity tomography, vertical electrical soundinglithological contrasts and saturated zonesVardar River; Vertical Corridor, Rupcha – Vetrino
Geotechnical boreholes, dynamic probingstratification, grain size and design geotechnical parametersRupcha – Vetrino; Vardar River
Hydrological studydischarges and scour depthPoarta Albă – Midia Năvodari canal
Thermal resistivityheat dissipation around a cable installed by HDDCopșa Mică solar plant connection
Register

Register of horizontal directional drilling works

A selection of works documented by contract or by the design documents, in reverse order of the contract year. The right-hand column states what the company did on each.

No.Obstacle crossedPipeline or lineCountryYearCompany scope
1DN150 Iancu Jianu – Balș gas pipeline110 kV underground power cableRO2026design
2Vardar Rivergas, DN700 Gevgelija – Negotino, Ø711 × 14.2 mmMK2026HDD design and verification report; geophysical and geotechnical study
3Olt River, at Ostrovenigas, branch line to DN400 Govora – DrăgășaniRO2026geotechnical and geophysical studies; design; supervision
4Poarta Albă – Midia Năvodari canalcrude oil, 14 and 28 in Constanța – BărăganuRO2025hydrological and geotechnical studies; geophysics including seismic reflection
5Golyama Kamchiya River, km 22+909gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
6Glavnitsa River, km 37+149gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
7Provadiyska River, km 51+453gas, DN1200 Rupcha – Vetrino, Ø1219 × 17.5 mmBG2025geotechnical boreholes; geophysical and geotechnical study; HDD design; construction support
8Route of the Copșa Mică solar plant cable connectionunderground power cableRO2025geotechnical, geological and geophysical study; interpretive lithological profile for HDD
9Struma River, km 1+500gas, DN700 Kulata – Kresna, Ø711 × 14.2 mmBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
10Struma River, km 4+500gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
11Struma River, km 7+300gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
12Strumeshnitsa River, km 13+100gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
13Struma River, km 45+500gas, DN700 Kulata – KresnaBG2025geotechnical and geophysical study; HDD design, built as designed; construction support
14Salina Turda, network of 12 drainsdrains for infiltration waterRO2022geotechnical and geophysical study; design
15Danube River, at Cernavodă (C1–C2)crude oil, Ø20 in and Ø28 in Constanța – BărăganuRO2021geotechnical and geophysical studies; design; permitting; construction support
16Borcea branch, at Fetești (C3–C4)crude oil, Ø20 in and Ø28 in Constanța – BărăganuRO2021geotechnical and geophysical studies; design; permitting; construction support

RO Romania · BG Bulgaria · MK North Macedonia. Items 5–7 and 9–13 belong to the Vertical Gas Corridor (Bulgartransgaz EAD), item 2 to the Greece – North Macedonia interconnector.

Projects

Selected work and its press coverage

For the larger projects we link to the press that covered them: news agencies, trade journals and the press releases of the transmission operators and of the banks financing them.

The articles describe the infrastructure projects our work is part of. The company's contribution is the one stated on each project card; the articles do not cover it.

International

Vertical Gas Corridor, Kulata – Kresna looping, Bulgaria

Five HDD crossings of the Struma and Strumeshnitsa rivers on the pipeline that raises transmission capacity between Greece and Bulgaria. We carried out the geotechnical and geophysical studies, designed the bores and supported construction. The crossings were built as designed.

Pipeline
DN700; at km 1+500, Ø711 × 14.2 mm, L415ME
Locations
Struma km 1+500, 4+500, 7+300, 45+500; Strumeshnitsa km 13+100
Year
2025
Client: GBS Energy Solutions EAD · End client: Bulgartransgaz EAD

Vertical Gas Corridor, Lot 3, Rupcha – Vetrino, Bulgaria

Three river crossings on the pipeline that doubles Bulgaria's exit capacity to Romania at the Negru Vodă / Kardam point. The work started with the geotechnical boreholes, continued with the geophysical and geotechnical study and covers HDD design and construction support.

Pipeline
DN1200, Ø1219 × 17.5 mm, L450ME
Locations
Golyama Kamchiya km 22+909; Glavnitsa km 37+149; Provadiyska km 51+453
Years
2025–2026
Client: GBS Energy Solutions EAD, EPC contractor · Owner: Bulgartransgaz EAD

Vardar River crossing, Greece – North Macedonia interconnector

HDD design for the Gevgelija – Negotino section and the final design verification report issued before drilling, built on the geophysical and geotechnical study of the route: high-resolution 2D seismic reflection, refraction and MASW, geoelectrical survey, dynamic probing, geotechnical boreholes and an interpretive lithological profile.

Pipeline
DN700, Ø711 × 14.2 mm, L450
Geometry
552.03 m in plan; 554.27 m drilled; R 900 m
Document
VRD-HDD-DES-001
Year
2026
Client: GBS Energy Solutions EAD · Contractor: Rapid Bild DOO Kumanovo · Investor: NER Skopje

Kozloduy Nuclear Power Plant, Units 7 and 8, Bulgaria

Geological and geophysical study for the site of the two AP1000 units: MASW and MAM seismic surveys on four lines to a minimum target depth of 225 m, seismic source generation for downhole tests and integrated interpretation with the geotechnical boreholes.

Methods
MASW; MAM; downhole
Source
gravity drop, 500 kg (boreholes 3 and 4, 150–30 m)
Year
2025
Client: Geotechnika ABS Ltd, Sofia

Romania

Danube at Cernavodă (C1–C2) and Borcea branch at Fetești (C3–C4), imported crude oil lines

HDD replacement of the crossing lines of the Constanța – Bărăganu pipelines, in place of the 12¾ in lines laid in 1968–1978. We carried out the geotechnical and geophysical studies, the design, the permitting and the construction support; the six bores were drilled in three months. The work was presented with Horizontal Drilling International at the DCA Europe annual congress.

Pipelines
crude oil, Ø20 in and Ø28 in
Bores
6, drilled in three months
Years
2021–2023
Owner: CONPET S.A. · Contractor: CIS GAZ S.A. – Horizontal Drilling International

Salina Turda, drainage of infiltration water

Geotechnical and geophysical study and design of a network of 12 drains installed by HDD, for long-term drainage of the western overburden hill.

Drains
12, by directional drilling
Year
2022
Owner: Salina Turda S.A.

Poarta Albă – Midia Năvodari canal, 14 and 28 in crude oil lines

Hydrological and geotechnical studies and geophysics, including seismic reflection, for the HDD replacement of the Constanța – Bărăganu lines at the canal crossing.

Pipelines
crude oil, 14 and 28 in
Stage
approvals, March 2026
Years
2025–2026
Owner: CONPET S.A.

In 2026 we are also designing the diversion of the Ø20 in Bărăganu – Onești crude oil line at the Focșani – Brăila expressway and the replacement of about 3 km of the Ø10¾ in crude oil line at Independența, both for CONPET S.A., and the protection of the DN150 and DN600 gas pipelines at the 110 kV underground cable in Balș.

On site

Our work in the field

Photographs from sites where we worked alongside the contractor, from stringing the pipe to pulling it through the bore.

Pipe string ready for pullback, drone view
Pipe string ready for pullback, drone view
Night-time pullback
Pullback runs through the night
Pullback work front, drone view
Pullback work front
Two coated pipes in the trench before tie-in
Pipes in the trench before tie-in
Valve assembly on a transmission pipeline
Existing valve assembly
Valve station and pipe string, drone view
Valve station and pipe string, drone view
About

Atanasiu & Skills

Atanasiu & Skills S.R.L., formerly Atanasiu Proiect S.R.L., has worked from Târgoviște since 2019. Design, survey, geophysics and geotechnics sit in one team, so the bore profile is drawn on data acquired and interpreted by the people who design it.

The company is led by Eng. Dragoș Alexandru Atanasiu, an engineer in Mining, Petroleum and Gas, specialised in Hydrocarbon Transmission, Storage and Distribution (Lucian Blaga University of Sibiu, top of the graduating class), and an ANRE-licensed PGT designer for natural gas transmission systems. Eng. Atanasiu designed the crossings on the Kulata – Kresna looping and the Vardar River crossing, led Lot 3 of the Vertical Corridor as chief project engineer and was project manager of the geological and geophysical study for Kozloduy Units 7 and 8.

CONPET S.A. rated the company "very good" for design and field studies in recommendation no. 34670 of 02.11.2020. We have been an associate member of DCA Europe since 2023, at the invitation of the association's vice-president.

DCA Europe associate member
ISO 9001 ISO 14001 ISO 45001
Contact

Tell us about your project

Phone
+40 723 185 663
E-mail
office@atanasiuskills.com
Office
Calea Domnească 57, building C1
Târgoviște 130167, Dâmbovița, Romania